3/2/21-Update on Water Authority of Western Nassau Project on Cisney Avenue – Water Treatment Plant – Proposed New Building

As discussed at the Village Board meeting on January 19th, The Water Authority of Western Nassau is proposing a new structure at the property located at  149 Cisney Avenue to accommodate the new treatment equipment necessary to meet the updated State Health Department domestic water requirements, specifically to treat 1,4-dioxane.  The structure will be built around the treatment equipment that is currently under construction at the rear of the property along the LIRR. 

Although not required, the Water Authority and their consultants have been working cooperatively with the Village Trustees and the Architectural Review Board in order to assure the new building will be designed to blend in with the neighborhood.  The image on the next page is a rendition of the agreed upon design superimposed in an actual photo of the site.   The work on the building is set to begin this summer, after the treatment equipment has been installed.  The Water Authority has also agreed to adding additional landscaping to mask the equipment planned for the area.

A phase 2, timeline to be determined, will include some changes to the existing building on site. 
As a part of this phase, the Village has requested improvements to the chain link fence and landscaping along the front of the property as well.  This scope of work is currently in preliminary design and will be shared once the Village receives more information.

Further updates will be communicated once they have been confirmed.

Diagrammatic Site Plan of the Proposed Work at the Cisney Avenue Water Treatment Plant

Architectural Rendering of the Proposed Cisney Avenue Water Treatment Building


January 16, 2020

Please be advised that the Village of Floral Park has been notified by the Water Authority of Western Nassau County (WAWNC) that WAWNC will soon begin a construction project at the WAWNC facility located at Cisney Avenue. The project will be for the construction of a wellhead treatment facility which is required to meet heightened water treatment standards mandated by  recent changes in New York State Department of Health Regulations.

The Village has requested Mr. Michael Tierney, the Superintendent of WAWNC, and representatives of H2M, the independent engineering company that will serve as WAWNC’s construction manager for this project, to discuss this construction project at the Village Board meeting to be held January 19, 2021.

The January 19, 2021 Village Board meeting will be held on zoom beginning at 8:00pm

The zoom login information is as follows:

Floral Park is inviting you to a scheduled Zoom meeting.
Topic: Regular Board of Trustees Meeting
Time: Jan 19, 2021 08:00 PM Eastern Time (US and Canada)
Join Zoom Meeting

https://us02web.zoom.us/j/81061748860?pwd=STZqU0NSd3E1c0tkcU95SHhoUTBTZz09

Meeting ID: 810 6174 8860
Passcode: 066787
Dial by your location
        +1 646 558 8656 US (New York)
Meeting ID: 810 6174 8860
Passcode: 066787